27 lines
612 B
Markdown
27 lines
612 B
Markdown
# Disaster Recovery Plan
|
|
|
|
Genesis Hosting is prepared to recover core systems from catastrophic failure.
|
|
|
|
## Recovery Objectives
|
|
|
|
- **RPO (Recovery Point Objective)**: 24 hours
|
|
- **RTO (Recovery Time Objective)**: 4 hours for customer services
|
|
|
|
## Full Recovery Flow
|
|
|
|
1. Triage the affected systems
|
|
2. Identify last successful backup or snapshot
|
|
3. Restore individual services:
|
|
- DNS
|
|
- WHMCS
|
|
- DirectAdmin
|
|
- AzuraCast
|
|
- TeamTalk
|
|
4. Run post-restore validation scripts
|
|
5. Notify customers of incident and resolution
|
|
|
|
## DR Testing
|
|
|
|
- Simulated quarterly
|
|
- Logs retained in `/var/log/genesisdr.log`
|